MIDROC Investment Group has launched a 1 billion birr coal processing facility in western Ethiopia, aiming to reduce reliance on imported fuel and strengthen supply for domestic industries.
Prime Minister Abiy Ahmed (PhD) attended the inauguration of the Arjo Coal Plant in Diga woreda, East Wollega zone of Oromia region. The facility is expected to supply cement, steel, and construction materials producers, sectors that have faced persistent cost pressures from imported coal.
The plant, completed in approximately 18 months, can process 200 tonnes of coal per hour and has created 250 permanent jobs, according to Gadisa Hirpa, corporate director of MIDROC’s mining cluster. The facility employs chemical-free processing and will be operated by the National Mining Corporation, a MIDROC subsidiary.

Jemal Ahmed, chief executive of MIDROC Investment Group, said the plant produces coal with a calorific value of 6,600, which the company says compares favourably with grades previously sourced from international suppliers.
Speaking at the launch, Habtamu Tegegne, minister of mines, positioned the project within Ethiopia’s broader industrial strategy. “Ethiopia is a country with extensive and varied mineral resources. By processing these domestically and capturing their value, we are beginning to translate this wealth into tangible gains and lift ourselves from dependency,” he said.
The minister added that in the past two years the country spent up to 300 million US dollars on imported coal, much of which can now be substituted by domestic production. Government support, he said, will ensure that the output from Arjo is fully integrated into local industrial supply chains, reinforcing the role of mining in economic growth.
