A $160 million US dollars petroleum logistics project linking Djibouti’s Damerjog industrial zone with Dewele in eastern Ethiopia is set to create a new pipeline route for refined fuel products, as the two countries seek to expand storage and reduce reliance on road transport.
Prime Minister Abiy Ahmed(PhD) , Djiboutian President Ismaïl Omar Guelleh and Dangote Group chairman Aliko Dangote announced the project on Thursday. The development is being undertaken through a partnership between Ethiopian Investment Holdings and Dangote Group.
The project includes a petroleum products storage terminal at Damerjog with capacity of 375,000 cubic metres and the ability to handle up to 5 million tonnes of petroleum products a year. The terminal will be connected to Dewele through a planned 120km multiproduct pipeline.
The terminal is planned across about 80 hectares and will be connected to the Damerjog Liquid Bulk Port through a common manifold system, as well as to the Damerjog-Nagad railway corridor.
The project comes as Ethiopia seeks additional petroleum storage and handling capacity. In March, Ethiopia’s transport and logistics minister said the country was interested in shifting some oil-product storage from the Horizon depot to Damerjog, citing rising consumption, limited existing storage and high tanker demurrage costs.

Damerjog Liquid Bulk Port has an oil jetty designed to handle up to 25 million tonnes a year and serves multiple storage terminals with aggregate static capacity of about 2 million cubic metres. The facility can handle products including diesel, jet fuel, gasoline, heavy fuel oil and LPG.
Ethiopia currently moves imported petroleum products from Djibouti into the country largely by tanker trucks. A logistics-sector assessment said the existing supply chain involves unloading fuel at Djibouti storage facilities before road transportation into Ethiopia, with the railway not connected to the Horizon terminal.
The new pipeline is intended to provide a dedicated route between the Damerjog storage and import facilities and Dewele on the Ethiopian side of the border. Project information published ahead of the groundbreaking ceremony says the infrastructure is expected to reduce road transport requirements and logistics costs while supporting fuel supply to the Ethiopian market.
The development also builds on Ethiopian Investment Holdings’ earlier engagement with Damerjog. In April, the state investment company requested land for a 150,000-cubic-metre fuel storage depot at the industrial park, close to the port’s manifold and railway infrastructure.
The pipeline and terminal form part of a broader expansion of petroleum infrastructure around Damerjog, positioning the Djibouti-Ethiopia corridor to handle larger volumes of imported refined fuel through integrated port, storage, rail and pipeline facilities.
For deeper coverage on Horn of Africa energy logistics, track updates on the Damerjog Dewele Fuel Terminal Pipeline, or explore official project details through Ethiopian Investment Holdings and the Djibouti Ports & Free Zones Authority.
