Skip to content

November, 2026

Birr Metrics
Birr Metrics
  • News
  • Feature
  • Insights
  • Interview
  • Startups
  • Editorial
  • Digital Magazine
Search
Birr Metrics
Birr Metrics
  • News
  • Feature
  • Insights
  • Interview
  • Startups
  • Editorial
  • Digital Magazine

Uganda and Tanzania Agree to Build Regional Petroleum Hub

staff writer
August 6, 2026

Uganda and Tanzania have agreed to develop a regional petroleum hub in Tanga, Tanzania, as the two countries expand cooperation on oil infrastructure, storage, refining, logistics and energy trade.

The agreement was signed between Uganda National Oil Company (UNOC), Tanzania Petroleum Development Corporation (TPDC) and Vitol Bahrain E.C. during Ugandan President Yoweri Kaguta Museveni’s working visit to Dar es Salaam, where he met Tanzanian President Samia Suluhu Hassan.

The Tanga Regional Energy Hub is expected to provide petroleum storage, refining, trading and distribution facilities, complementing Uganda’s oil projects, including the planned 60,000-barrel-per-day Hoima refinery.

The project builds on the East African Crude Oil Pipeline (EACOP), which is being developed to transport crude oil from Uganda’s oil fields in Hoima to the Tanzanian port of Tanga. Officials said the new hub will support regional energy security and expand petroleum trade across East and Central Africa.

Tanzania’s Energy Minister Deo Ndejembi said the development represents the next phase of cooperation between the two countries after EACOP, shifting focus towards downstream activities that create additional economic value.

He said the proposed hub could attract investments exceeding 20 billion US dollars, making it one of the largest integrated energy infrastructure projects planned in sub-Saharan Africa.

Uganda’s Minister of Energy and Mineral Development Monica Musenero said the partnership would support industrialisation by creating opportunities in engineering, operations, maintenance, laboratory services and other specialised sectors.

Uganda is seeking to develop more value from its petroleum resources through downstream industries rather than exporting raw commodities, Musenero said.

Feasibility and front-end engineering design studies for a refined petroleum products pipeline and storage terminal are progressing, with completion expected later this year. Studies for a natural gas pipeline linking Uganda and Tanzania are also expected to conclude by October 2026.

The two countries are also advancing electricity cooperation through a planned 400kV power interconnector. Uganda secured 250 million US dollars in financing for its section of the project, which is expected to strengthen electricity exchange and regional power trading.

Officials from both countries said the Tanga Regional Energy Hub and Uganda’s Hoima refinery are complementary projects that could improve energy supply, create jobs and strengthen trade links across the region.

The agreement marks a further expansion of Uganda-Tanzania energy cooperation following the development of EACOP, which has become a central project in the countries’ efforts to develop cross-border petroleum infrastructure.

Share:

More News

National Bank of Ethiopia
NBE Proposes 10,000 Birr Fine Per Share for Unauthorised Bank Acquisitions

Draft directive would invalidate non-compliant share transactions and impose penalties on banks, with fines reaching 10 million birr for every 1,000 s

Read More
National Bank of Ethiopia liquidity absorption and maturing central bank deposit concept.
Foreign Banks With 10 Billion US Dollars in Assets Could Fully Acquire Ethiopian Banks

Draft directive sets conditions for 100 percent foreign takeovers Foreign banks could acquire up to 100 percent ownership of existing Ethiopian commer

Read More
Global Aviation Needs 200-Fold Surge in Sustainable Fuel
Global Aviation Needs 200-Fold Surge in Sustainable Fuel Production to Meet 2050 Climate Goal

Green aviation fuel accounts for less than one percent of global consumption as governments push for investment, harmonised regulations and expanded p

Read More
NBE Presses Banks to Close Financial Service Gaps
NBE Presses Banks to Close Financial Service Gaps in Ethiopia’s Special Economic Zones

Central bank demands practical measures as stricter banking rules take effect across investment hubs developed with more than 1.5 billion US dollars i

Read More

Share your love

Menu
  • News
  • Feature
  • Insights
  • Interview
  • Startups
  • Editorial
  • About us
  • Digital Magazine
  • Privacy Policy

hello@birrmetrics.com

Copyright © 2026 Birr Metrics | All Rights Reserved

Designed By Collab Systems

Scroll to Top